Case studies
EWS24 Office Building in Frankfurt/Main, Germany, 2021
The EWS24 building project with more than 50,000 m² gross floor area was built by the project developer "Lang & Cie. Real Estate AG" and has already been fully leased. Read how LOYTEC L-ROC room automation and the high-quality LPAD-7 touch room control unit keep tenant comfort and flexibility high and support a DGNB certification.
Office Building in Athens, Greece, 2020
This headquarters of a famous telephone company is located in the center of Athens and consists of two buildings with 4 floors above ground and a garage. The project realized focuses on energy efficiency and implements a BEMS supervision system with local and remote management.
The Oval, Office Building in Düsseldorf, Germany, 2021
Karadeniz Technical University in Trabzon, Turkey, 2021
The Karadeniz Technical University is a public research university with 80 departments, 12 faculties and 6 graduate schools spread over a huge campus. Find out how Termmarket successfully managed to integrate a total of 34 departments and also 7 external faculties on one central LWEB-900 BMS server and fulfilled the energy efficiency requirements requested by the customer.
Test Laboratory in Aarhus, Denmark, 2020
The test laboratory in Aarhus is a cornerstone in fighting Covid-19 in Denmark, and it also provdes a great example of the benefits gained from remote management of a building. Discover which LOYTEC controls are at the core of a comprehensive automation solution!
Office Park 4, Office Building in Schwechat, Austria, 2020
Hippodrome Paris-Longchamp in France, 2021
BEMAX Arena in Podgorica, Montenegro, 2020
The multifunctional sports and event hall built in the Seventies now has been revitalized and transformed into a vibrant, integrated facility for the entire community to use. Find out how the retrofit project benefits from LOYTEC products - optimizing energy efficiency, hardware costs and integration time.
Public Aquarium in Antalya, Turkey
The top priority of the investor for the revitalization project was to get a seamless multidisciplinary integration of all already installed systems in the building. The heart of the solution is LOYTEC's L-INX Automation Server. Check out why!
Read more: Public Aquarium in Antalya, Turkey
Erciyes University in Kayseri, Turkey, 2020
Logistic Center in Piacenza, Italy, 2019
The logistic center located in Piacenza supplies the region Southern Europe for a major European retailer. With sustainability in mind, the furniture store company went for a retrofit of their lighting solution. Take a look at the energy savings potential of modern lighting control systems by LOYTEC!
Delta Electronics Beijing Office, China, 2017
The U.S. Green Building Council (USGBC) has just granted the LEED NC (New Construction) Silver Certification to Delta Electronics’ Beijing Office. Delta’s Beijing office has demonstrated an impressive 20% cut in overall energy costs as compared to the annual baseline reference of the 2007 ASHREA standard 90.1.
Langestraße 100, Baden-Baden, Germany, 2016
Manchester Airport, Manchester, Great Britain
After the successful implementation of a lighting control system for the public areas of Manchester Airport's terminal 2, the LOYTEC Competence Center Calon in cooperation with the company Building Environment Control, have now extended the very same lighting control solution to the public areas of the airport’s terminals T1 & T3.
Continente Hypermarket, Braga Nova Arcada, Portugal, 2016
The LOYTEC Competence Partner RACE installed a total control solution for the Continente Hypermarket, Braga Nova Arcada based on LOYTEC components. The solution integrates all systems of the store from refrigeration to HVAC and lighting and allows for increased energy efficiency and transparent management of the technical equipment.
Royal Australian Air Force, Pearce Base, Perth, Australia, 2016
The Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.
Parmelia Hotel (Hilton), Perth, Australia, 2016
NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015
University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015
PAMA fahd al ahmad branch, Kuwait, 2015
The LOYTEC Competence Partner Ahmed Isaq Co. integrated electrical and mechanical systems in the PAMA fahd al ahmad branch in Kuwait, the seat of the public authority of minority affairs.
PAMA west al jahra branch, Kuwait, 2015
Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.
District Office Sigmaringen, Germany, 2015
At the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.
Business Park Vienna, Austria, 2015
The great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.
Hotel Management School Belvoirpark, Switzerland, 2015
PentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.
Fire Directorate, Kuwait, 2015
The Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.
AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015
The AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.
Penal Institution Schwerte, Germany, 2015
The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.