Rheinwerk 3, Bonn, Germany, 2015

Rheinwerk 3, GermanyRheinwerk 3 is a premium office facility located in the former German capital Bonn. With its unique location at the River Rhine at the “Bonner Bogen”, the architecture and equipment of the building, and the comprehensive infrastructure, Rheinwerk 3 is one of the most attractive locations in and around Bonn. The use of most modern technology allows to implement resource-saving energy concepts, as confirmed by the DGNB gold certificate. Lighting, sun blinds, and energy supply can be controlled conveniently and individually from a PC. All conference rooms are equipped with comfortable touch panels. (Reference: https://www.rheinwerk3.de/en)

The building automation system has been implemented by Kieback & Peter (subsidiary Köln). Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs. L-DALI Constant Light Controllers integrate the DALI lighting system into room automation. LGATE-950 Gateways are used in individual rented areas for managing graphical projects for virtual room operations via web browser and for providing access to the LonMark system. L-VIS Touch Panels allow to conveniently operate conference rooms. 

Installed LOYTEC devices Lighting Visualization Sun Blinds Control Climate Control


Interesting Facts

Devices: LGATE-950LIP-3ECTBLDALI-3E102LVIS-3ME12

Location Bonn, Germany
Number of Nodes 1,800
Topology BacNet, LonWorks FT10, IP Network
Companies involved Kieback & Peter GmbH & Co. KG
LOYTEC Components         49 x LGATE-950,
25 x LIP-3ECTB,
67 x LDALI-3E102,
33 x LVIS-3ME12 
LOYTEC Tools
L-INX Configurator