Case studies

Gallileo Tower, Frankfurt, Germany

Gallileo_s.jpg The new office tower of Dresdner Bank in Frankfurt has 38 floors and offers approximately 30,000 square meters of office space.

Junghof Plaza, Frankfurt, Germany

Junghof_Plaza_s.jpg In the heart of Frankfurt's banking area, in Junghofstraße, a sophisticated office building called Junghof Plaza with eight upper floors and an office area of approximately 35,000 m2 has been constructed.

Wangjing International Commercial Center, Beijing, China

wangjing_icc_s.jpg The Wangjing International Commercial Center, approximately 120,000 square meters, is located in the famous Wangjing area, which is the largest modern residential area of Beijing, China.

Jaarbeurs Utrecht, Netherlands

jaarbeurs_utrecht_s.jpg Jaarbeurs Utrecht is the place to meet in the Netherlands. Whether it is for a short meeting, a congress of several days, a trade fair, or any other event, Jaarbeurs Utrecht offers the appropriate facilities and services.

City Tower and Kubus Offenbach, Germany

Citytower_Kubus_s.jpgThe City Tower and the adjacent Kubus are equipped with cutting edge building technology. The network infrastructure is made up of devices by LOYTEC.

International Horticultural Exposition Shenyang, China

shenyang_s.jpg For HVAC and streetlight control at the International Horticultural Exposition 2006, located in Shenyang, China, LOYTEC tools and infrastructure components were used.

Royal Netherlands Embassy, Berlin, Germany

nl_botschaft_s.jpgNew building of Royal Netherlands Embassy in Berlin, Germany.

Sparkasse Ingolstadt, Germany

spak_ing_s.jpgAfter a two-year construction period in the center of the upper-Bavarian Danube city the head office of the Sparkasse Ingolstadt was inaugurated. The building automation system is based on infrastructure components from LOYTEC.

KfW Frankfurt, Germany

KfW_s.jpgOne of the most complex CEA-709 installations in Europe was realized in the new building of the KfW (Kreditanstalt für Wiederaufbau) Frankfurt by the ARGE KfW-MSR.

City Hall Innsbruck, Austria

Rathaus_s.jpg The shopping center in the old city hall is the new hot spot of Innsbruck. Seven cafes, bars, and restaurants cater for visitors and invite them to stay.

Hospital of Rohrbach, Austria

LKH_Rohrbach_s.jpgIn the course of renovating the hospital in Rohrbach, Austria, CEA-709 was implemented as the building control system.

Federal School Center Wörgl, Austria

bundesschulzentrum_s.jpgThe building automation of the newly reorganized and extended federal school center in Wörgl was implemented with LOYTEC devices.

Retirement Community Wörgl, Austria

senioren_s.gifThe network infrastructure of the retirement community Wörgl is built up out of network infrastructure components from LOYTEC.

Central Park Sossenheim, Germany

CentraIPark_s.jpgThe Central Park is a new industrial park near Sossenheim, Germany. Three of the buildings there have been automated using LOYTEC components for the network infrastructure.

CHG-Meridian Weingarten, Germany

CHG_Weingarten_s.jpg New office building for the headquarters of CHG-Meridian, Deutsche Computer Leasing AG, in Weingarten.

Zhaoqing Intercity Railway Station, Zhaoqing, China, 2016

Zhaoquing RailwayDelta GreenTech and LOYTEC Work Hand-in-hand on China’s Next-Gen Railway Station

Hontai Plaza, Ningbo, China, 2016

Hontai PlazaParagon of Intelligent Building Management - have a look at this ambitious project that implemented an effective building automation solution that enhances efficiency and reduces unnecessary energy consumption of electrical and mechanical equipment.

ParkLake Shopping Center, Bucharest, Romania, 2016

ParkLake"A new shopping experience in a space that combines an environmentally friendly design with a distinctive range of leisure and sport."