Case studies

Aurelium, Boulogne-Billancourt, France, 2022

Image ©2022 GoogleThis is VINCI Immobilier's second office building in the new "Rives de Seine" district in Boulogne-Billancourt. It offers 10,000 M² of office space and 159 parking spaces. It is located at 1 Cours de l’île Seguin.

EWS24 Office Building in Frankfurt/Main, Germany, 2021

DekaBank Frankfurt a.M. Copyright @ Lang & Cie. Real Estate AGThe EWS24 building project with more than 50,000 m² gross floor area was built by the project developer "Lang & Cie. Real Estate AG" and has already been fully leased. Read how LOYTEC L-ROC room automation and the high-quality LPAD-7 touch room control unit keep tenant comfort and flexibility high and support a DGNB certification.

Office Building in Athens, Greece, 2020

office building athens

This headquarters of a famous telephone company is located in the center of Athens and consists of two buildings with 4 floors above ground and a garage. The project realized focuses on energy efficiency and implements a BEMS supervision system with local and remote management. 

Office Building "People Hub" in Roma, Italia, 2021 (Italian)

Imagery ©2022 Google, Imagery ©2022 Maxar Technologies, Map data ©2022Il sistema di BMS gestisce gli impianti elettrici e meccanici di una struttura formata da 6 torri, ciascuna composta da 8 piani più coperture ed interrati.

Office Building "People Hub" in Rome, Italy, 2021

Imagery ©2022 Google, Imagery ©2022 Maxar Technologies, Map data ©2022 The new Accenture hub in Italy was inaugurated in Rome in 2019, and it consists of six towers connected to each other at each level along 26000 square meters of surface.

The Oval, Office Building in Düsseldorf, Germany, 2021

Foto: Patrick NiemeyerThe new construction project "The Oval" was designed as a digital, sustainable and state-of-the-art office building. Equipped with LOYTEC's L-ROC room automation system, tenants can enjoy a flexible and energy-efficient office building that has already succeeded in winning awards.

Residenza Hollmann, Hotel in Trieste, Italy, 2020

Hollmann googleRead about the Residenza Hollmann project in Italy and how LOYTEC room energy management accommodates guest comfort and energy efficiency.

Karadeniz Technical University in Trabzon, Turkey, 2021

Karadeniz Technical University in Trabzon, Turkey, 2021The Karadeniz Technical University is a public research university with 80 departments, 12 faculties and 6 graduate schools spread over a huge campus. Find out how Termmarket successfully managed to integrate a total of 34 departments and also 7 external faculties on one central LWEB-900 BMS server and fulfilled the energy efficiency requirements requested by the customer.

Test Laboratory in Aarhus, Denmark, 2020

Aarhus Lab

The test laboratory in Aarhus is a cornerstone in fighting Covid-19 in Denmark, and it also provdes a great example of the benefits gained from remote management of a building. Discover which LOYTEC controls are at the core of a comprehensive automation solution!

Office Park 4, Office Building in Schwechat, Austria, 2020

office park schwechatThanks to the LOYTEC L-ROC Room Automation System tenants benefit from high user comfort and energy savings generated by automatic shading, DALI constant light control including optimal temperature control. Discover more details about this impressive project!

The Jacobins Convent - Event Center in Rennes, France, 2020

Imagery 2020 Google Map Data 2020 Retrofitting the Jacobins convent (built in the 14th century) into an event center is the main goal of this ambitious project. Read how this historic building steps into the 21st century with LOYTEC.

City Hall in Forli, Italy, 2020

Comune di ForliRetrofitting traditional buildings like the historic City Hall in Forli is a challenge with specific requirements. Find out which LOYTEC devices are the core of the implemented building automation system using EnOcean, Mesh-WLAN and IoT integration.

Hippodrome Paris-Longchamp in France, 2021

Paris Longchamp google maps small with copyrightThe famous Paris-Longchamp racecourse now shines in new splendor with a DALI lighting control system that spans 6 buildings. Read how the LOYTEC L-DALI lighting solution contributes significantly to the energy savings achieved and plays a crucial role in creating a high-quality room ambience.

BEMAX Arena in Podgorica, Montenegro, 2020

bemax googleThe multifunctional sports and event hall built in the Seventies now has been revitalized and transformed into a vibrant, integrated facility for the entire community to use. Find out how the retrofit project benefits from LOYTEC products - optimizing energy efficiency, hardware costs and integration time.

Public Aquarium in Antalya, Turkey

Antalya Aquarium, Photo ©МаратДThe top priority of the investor for the revitalization project was to get a seamless multidisciplinary integration of all already installed systems in the building. The heart of the solution is LOYTEC's L-INX Automation Server. Check out why!

Read more: Public Aquarium in Antalya, Turkey

Tire Factory in Aksaray, Turkey, 2020

tire turkeyOne of the most important Bridgestone factories is rated to produce around 4.2 million tires a year. Find out how LOYTEC hardware used in the test lab to control the HVAC system helped the customer to reach a "zero defect" product target.

TFF Football Federation Training Center in Riva, Turkey, 2019

football 1331843 1920The new Turkey Football Federation training facility at the Black Sea is an impressive building complex. Read which LOYTEC products are the core of the facilities's HVAC automation solution.

Erciyes University in Kayseri, Turkey, 2020

Erciyes University in Kayseri, Turkey, 2020The building automation solution implemented at the Erciyes University is one of the biggest LOYTEC projects in Turkey so far. Continue reading to get to know the control potentials of LOYTEC’s L-INX Automation Server and L-IOB I/O Controller product range.

Logistic Center in Piacenza, Italy, 2019

piacenzaThe logistic center located in Piacenza supplies the region Southern Europe for a major European retailer. With sustainability in mind, the furniture store company went for a retrofit of their lighting solution. Take a look at the energy savings potential of modern lighting control systems by LOYTEC!

Shanghai Oriental Hospital, Shanghai 2019

Shanghai Oriental HospitalThe Shanghai Oriental Hospital experiences significant improvements of the operational efficiency using the LOYTEC Building Automation Solution. Read more about this challenging sucess story!

China Mobile Data Center, Henan, 2018

China Mobile DC 1 editedThe China Mobile Data Center in the Zhengzhou Experimental Comprehensive Zone is China Mobile's largest communications production and information service base in the central plain region.

Austria Campus, Vienna, 2018

Foto: SIGNAExcellently located in the second district of Vienna, in what is one of the most interesting business locations of the city, AUSTRIA CAMPUS emerges.

PPP Kalvebod Brygge, Kopenhagen, Denmark, 2018

city of chandler city hallKalvebod Brygge is placed as a visual landmark at the gateway to central Copenhagen - both to drivers along Kalveboderne Quay and train passengers to and from Copenhagen.

Delta Electronics Beijing Office, China, 2017

Delta Electronics Beijing OfficeThe U.S. Green Building Council (USGBC) has just granted the LEED NC (New Construction) Silver Certification to Delta Electronics’ Beijing Office. Delta’s Beijing office has demonstrated an impressive 20% cut in overall energy costs as compared to the annual baseline reference of the 2007 ASHREA standard 90.1.

City of Chandler, City Hall, Arizona, USA, 2017

chandler google 2With a recent City Hall project the City of Chandler is once again using LOYTEC products in order to benefit from energy savings. Read more about this case study!

Ishbylia Intermediate Boys School, Kuwait, 2017

Ishbylia boysAfter successfully implementing a central BMS at Ishbylia Intermediate Girls School the Ministry of education Kuwait country also assigns AHMED ISHAQ for this Intermediate Boys School project. Have a look at the project details!

The Hub, IT Office Building, Bangalore, India 2017

The Hub, IT Office Building, Bangalore, India 2017In search for a reliable VAV solution for the five floor IT Business Building of Brillio LOYTEC BMS LWEB-900 was the first choice. Have a look at the solution that was successfully implemented.

Delta EMEA Headquarters in Hoofddorp, Netherlands, 2017

delta emea headquarter hoofdorp 2017The renovation and upgrade of the existing office building in Hoofddorp transforms the Delta EMEA Headquarters into a modern working environment. This retrofit project delivers impressive results you need to read about!

Ishbylia Intermediate Girls School, Kuwait, 2017

IshbyliaFor the development of the educational buildings the Ministry of Education in Kuwait asked for a central BMS. Ahmed Ishaq Co. presented an innovative solution building on LOYTEC technology. 

Langestraße 100, Baden-Baden, Germany, 2016

Baden-BadenLangestraße 100 in Germany is a newly built 5-star rated design hotel with 130 spacious rooms and suites, a state-of-the-art medical center with 15 medical specialists, an apartment building with 16 flats and a two-storey underground garage with 200 parking spaces.

Manchester Airport, Manchester, Great Britain

Manchester AirportAfter the successful implementation of a lighting control system for the public areas of Manchester Airport's terminal 2, the LOYTEC Competence Center Calon in cooperation with the company Building Environment Control, have now extended the very same lighting control solution to the public areas of the airport’s terminals T1 & T3.

Schlumberger Factory, Guebwiller, France, 2016

NSC SchlumbergerThe subsidiary of Arcom, Arcom Alsace Lorraine installed a building automation system that allows the Schlumberger factory to be monitored and managed completely automatically while allowing the users to override the system locally.

Continente Hypermarket, Braga Nova Arcada, Portugal, 2016

Continente Hypermarket, Braga Nova ArcadaThe LOYTEC Competence Partner RACE installed a total control solution for the Continente Hypermarket, Braga Nova Arcada based on LOYTEC components. The solution integrates all systems of the store from refrigeration to HVAC and lighting and allows for increased energy efficiency and transparent management of the technical equipment.

Royal Australian Air Force, Pearce Base, Perth, Australia, 2016

raafThe Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.

OBI Market Nuremberg, Germany, 2016

OBI market NurembergThe OBI home improvement store in Nuremberg, a two-story building with a retail area of approximately 12,000 m2, was built in February 2014. For lighting control the building automation system was equipped with a LOYTEC DALI lighting system. 

Parmelia Hotel (Hilton), Perth, Australia, 2016

Parmelia HotelThe company BCS was commissioned to upgrade the existing Chiller Controls in the Parmelia Hilton. The new system provides the hotel operator with improved monitoring and control features and delivers extensive experience values for energy efficient operations.

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015NAPP Pharmaceuticals based at the Cambridge Science Park in Cambridge employed both the consultancy and engineering divisions of the LOYTEC Competence Partner SGCI for the design and commissioning of a complex lighting control solution based on the open standard of DALI. 

City of Rockingham, Perth, Australia, 2016

City of RockinghamThe LOYTEC Competence Partner Building Control Systems was engaged to modernize the existing BMS of the City of Rockingham – a local city council – for a reliable and accurate operation. Have a look at some details of this retrofit project!

Fremantle Esplanade Hotel (Rydges), Australia, 2016

Fremantle_Esplanade_HotelThe LOYTEC Competence Partner Building Control Systems was engaged to replace the existing building management system of the Rydges Hotel in Fremantle, a heritage listed 4.5 star hotel.

University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015

University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015The Lincoln University approached the LOYTEC Competence Partner SGCI to come up with a cost viable solution to replace the old building management system with the caveat to drastically improve user comfort within the building and occupied spaces as well as reducing energy consumption.

PAMA fahd al ahmad branch, Kuwait, 2015

PAMA fahd al ahmad branch, Kuwait, 2015The LOYTEC Competence Partner Ahmed Isaq Co. integrated electrical and mechanical systems in the PAMA fahd al ahmad branch in Kuwait, the seat of the public authority of minority affairs.

PAMA west al jahra branch, Kuwait, 2015

PAMA west al jahra branch, Kuwait, 2015Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.

District Office Sigmaringen, Germany, 2015

District Office SigmaringenAt the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.

Business Park Vienna, Austria, 2015

MR-TechThe great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.

Poinciana High School, USA, 2015

Poinciana High SchoolThe LOYTEC Competence Partner TBI was awarded the project of replacing the building automation system in the oldest area of Poinciana High School. The project consisted of 37 AHUs (Air Handling Units), 2 chiller plants and 164 VAV (Variable Air Volume) units.

Hotel Management School Belvoirpark, Switzerland, 2015

Hotel Management School BelvoirparkPentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.

Secondary School Loulé, Algarve, Portugal, 2015

Secondary School Loulé, Algarve, Portugal, 2015In the course of Portugal's Secondary School’s Modernization Program, the secondary school Loulé in the Algarve region has been modernized by RACE using LOYTEC products.

Fire Directorate, Kuwait, 2015

Fire Directorate, KuwaitThe Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components. 

AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015

AIM Recycling CenterThe AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.

Penal Institution Schwerte, Germany, 2015

JVA Schwerte The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.