Case studies

Shanghai Oriental Hospital, Shanghai 2019

Shanghai Oriental HospitalThe Shanghai Oriental Hospital experiences significant improvements of the operational efficiency using the LOYTEC Building Automation Solution. Read more about this challenging success story!

TFF Football Federation Building in Riva, Turkey, 2019

football 1331843 1920The new Turkey Football Federation training facility at the Black Sea is an impressive building complex. Read which LOYTEC products are the core of the facility's HVAC automation solution.

Logistic Center in Piacenza, Italy, 2019

piacenzaThe logistic center located in Piacenza supplies the region of Southern Europe for a major European retailer. With sustainability in mind, the furniture store company went for a retrofit of their lighting solution. Take a look at the energy savings potential of modern lighting control systems by LOYTEC!

China Mobile Data Center, Henan, 2018

China Mobile DC 1 editedThe China Mobile Data Center in the Zhengzhou Experimental Comprehensive Zone is China Mobile's largest communications production and information service base in the central plain region.

City of Chandler, City Hall, Arizona, USA, 2017

chandler google 2With a recent City Hall project the City of Chandler is once again using LOYTEC products in order to benefit from energy savings. Read more about this case study!

PPP – Kalvebod Brygge, Kopenhagen, Denmark, 2018

PPP – Kalvebod Brygge, Kopenhagen, Denmark, 2018 Kalvebod Brygge is placed as a visual landmark at the gateway to central Copenhagen - both to drivers along Kalveboderne Quay and train passengers to and from Copenhagen.

The Hub, IT Office Building, Bangalore, India 2017

The Hub, IT Office Building, Bangalore, India 2017In search for a reliable VAV solution for the five floor IT Business Building of Brillio LOYTEC BMS LWEB-900 was the first choice. Have a look at the solution that was successfully implemented.

Ishbylia Intermediate Boys School, Kuwait, 2017

Ishbylia boysAfter successfully implementing a central BMS at Ishblyia Intermediate Girls School the Ministry of education Kuwait country also assigns AHMED ISHAQ for this Intermediate BOYS School Project. Have a look at project details!

BEMAX Arena in Podgorica, Montenegro, 2020

bemax googleThe multifunctional sports and event hall built in the Seventies now has been revitalized and transformed into a vibrant, integrated facility for the entire community to use. Find out how the retrofit project benefits from LOYTEC products - optimizing energy efficiency, hardware costs and integration time.

Tire Factory in Aksaray, Turkey, 2020

tire turkeyOne of the most important Bridgestone factories is rated to produce arround 4.2 million tires a year. Find out how LOYTEC hardware used in the test lab to control the HVAC system helped the customer to reach a "zero defect" products target.

Office Building "People Hub" in Rome, Italy, 2021

Imagery ©2022 Google, Imagery ©2022 Maxar Technologies, Map data ©2022 The new Accenture hub in Italy was inaugurated in Rome in 2019, and it consists of six towers connected to each other at each level along 26000 square meters of surface.

Residenza Hollmann, Hotel in Trieste, Italy, 2020

Hollmann googleRead about the Residenza Hollmann project in Italy and how LOYTEC room energy management accommodates guest comfort and energy efficiency.

Office Park 4, Office Building in Schwechat, Austria, 2020

office park schwechatClose to Vienna International Airport (VIE) the Office Park 4 building complex offers more than 20,000 m² of office space and flexible co-working areas. Thanks to LOYTEC L-ROC Room Automation, tenants benefit from high user comfort and energy savings generated by automatic shading, DALI constant light control including optimal temperature control. Discover more details about this impressive project!

Erciyes University in Kayseri, Turkey, 2020

Erciyes University in Kayseri, Turkey, 2020The complete building automation solution implemented at the Erciyes University is one of the biggest LOYTEC projects in Turkey so far. Continue reading to get to know the control potentials of LOYTEC’s L-INX Automation Server and L-IOB I/O Controller product range.

イシビリア女子中学校、クウェート、2017

IshbyliaFor the development of the educational buildings the Ministry of Education in Kuwait asked for a central BMS. Ahmed Ishaq Co. presented an innovative solution building on LOYTEC technology.

ラングストラーサホテル(ドイツ・バーデンバーデン、2016)

Baden-BadenLangestraße 100 in Germany is a newly built 5-star rated design hotel with 130 spacious rooms and suites, a state-of-the-art medical center with 15 medical specialists, an apartment building with 16 flats and a two-storey underground garage with 200 parking spaces.

Delta Electronics Beijing Office, China, 2017

Delta Electronics Beijing OfficeThe U.S. Green Building Council (USGBC) has just granted the LEED NC (New Construction) Silver Certification to Delta Electronics’ Beijing Office. Delta’s Beijing office has demonstrated an impressive 20% cut in overall energy costs as compared to the annual baseline reference of the 2007 ASHREA standard 90.1. 

マンチェスター空港(イギリス・マンチェスター、2016)

Manchester AirportAfter the successful implementation of a lighting control system for the public areas of Manchester Airport's terminal 2, the LOYTEC Competence Center Calon in cooperation with the company Building Environment Control, have now extended the very same lighting control solution to the public areas of the airport’s terminals T1 & T3.

シュルンベルジェ工場(フランス・ゲブヴィレール、2016)

NSC SchlumbergerThe subsidiary of Arcom, Arcom Alsace Lorraine installed a building automation system that allows the Schlumberger factory to be monitored and managed completely automatically while allowing the users to override the system locally.

コンティネンテハイパーマーケット Nova Arcada (ポルトガル・ブラガ、2016)

Continente Hypermarket, Braga Nova ArcadaThe LOYTEC Competence Partner RACE installed a total control solution for the Continente Hypermarket, Braga Nova Arcada based on LOYTEC components. The solution integrates all systems of the store from refrigeration to HVAC and lighting and allows for increased energy efficiency and transparent management of the technical equipment.

王立オーストラリア空軍ピアース基地(オーストラリア・パース、2016 )

raafThe Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.

OBIホームセンター(ドイツ・ニュルンベルク、2016)

OBI market NurembergThe OBI home improvement store in Nuremberg, a two-story building with a retail area of approximately 12,000 m2, was built in February 2014. For lighting control the building automation system was equipped with a LOYTEC DALI lighting system. 

パメリア ヒルトン ホテル(オーストラリア・パース、2016 )

Parmelia HotelThe company BCS was commissioned to upgrade the existing Chiller Controls in the Parmelia Hilton. The new system provides the hotel operator with improved monitoring and control features and delivers extensive experience values for energy efficient operations.

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015NAPP Pharmaceuticals based at the Cambridge Science Park in Cambridge employed both the consultancy and engineering divisions of the LOYTEC Competence Partner SGCI for the design and commissioning of a complex lighting control solution based on the open standard of DALI.

シティ・ オブ・ロッキングハム (オーストラリア・パース、2016)

City of RockinghamThe LOYTEC Competence Partner Building Control Systems was engaged to modernize the existing BMS of the City of Rockingham – a local city council – for a reliable and accurate operation

エスプラネード フリーマントルホテル(オーストラリア、2016)

Fremantle_Esplanade_HotelThe LOYTEC Competence Partner Building Control Systems was engaged to replace the existing building management system of the Rydges Hotel in Fremantle, a heritage listed 4.5 star hotel.

University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015

University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015The Lincoln University approached the LOYTEC Competence Partner SGCI to come up with a cost viable solution to replace the old building management system with the caveat to drastically improve user comfort within the building and occupied spaces as well as reducing energy consumption.

PAMA fahd al ahmad branch, Kuwait, 2015

PAMA fahd al ahmad branch, Kuwait, 2015The LOYTEC Competence Partner Ahmed Isaq Co. integrated electrical and mechanical systems in the PAMA fahd al ahmad branch in Kuwait, the seat of the public authority of minority affairs.

PAMA west al jahra branch, Kuwait, 2015

PAMA west al jahra branch, Kuwait, 2015Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.

District Office Sigmaringen, Germany, 2015

District Office SigmaringenAt the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.

Business Park Vienna, Austria, 2015

MR-TechThe great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.

Poinciana High School, USA, 2015

Poinciana High SchoolThe LOYTEC Competence Partner TBI was awarded the project of replacing the building automation system in the oldest area of Poinciana High School. The project consisted of 37 AHUs (Air Handling Units), 2 chiller plants and 164 VAV (Variable Air Volume) units.

Hotel Management School Belvoirpark, Switzerland, 2015

Hotel Management School BelvoirparkPentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.

Secondary School Loulé, Algarve, Portugal, 2015

Secondary School Loulé, Algarve, Portugal, 2015In the course of Portugal's Secondary School’s Modernization Program, the secondary school Loulé in the Algarve region has been modernized by RACE using LOYTEC products. 

Fire Directorate, Kuwait, 2015

Fire Directorate, KuwaitThe Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components. 

AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015

AIM Recycling CenterThe AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.

Penal Institution Schwerte, Germany, 2015

JVA Schwerte The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte. 

Rheinwerk 3, Bonn, Germany, 2015

Rheinwerk3, GermanyRheinwerk 3 is a premium office facility located in the former German capital Bonn. Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs.

Continente Hypermarket, Matosinhos, Portugal, 2015

Hypermarket Continente, MatosinhosThe LOYTEC Competence Partner RACE implemented a new building management system using the latest technology of LOYTEC in the Continente Hypermarket in Matosinhos, Portugal.

Osceola County Health Department, Poinciana, Florida, 2014

Osceola County Health DepartmentOsceola County Health Department is a five million dollar medical facility in Florida. For the control of the HVAC system of the building, the LOYTEC Competence Partner Total Building Integrations Inc. installed an ALL-IP BACnet system with LOYTEC components. 

Hypermarket in Alor Setar - Kedah, Malaysia 2014

Hypermarket in Alor Setar - Kedah, MalaysiaThe LOYTEC partner M&C Engineering and Trading Sdn Bhd implemented a project for a new hypermarket in Alor Setar - Kedah, Malaysia. There, LOYTEC’s powerful LINX-110 Automation Servers extended with L-IOB I/O Modules are in charge of controlling and monitoring the hypermarkets’ systems. 

Quartier 17, Hanseatic City Stralsund, Germany, 2014

Quartier 17A project of the LOYTEC Competence Partner Dr. Diestel regarding control and visualization of different room air conditioning systems of the newly built Quartier 17 in the Hanseatic City Stralsund in Germany.

Heatherbrae Elementary School, Arizona, USA, 2014

MPBASThe LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.

Camões Building, Porto, Portugal, 2014

Camões BuildingThe Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.

Shopping Center Allegro, Setúbal, Portugal, 2014

Allegro SetúbalThe shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.

Hospitals Senhor do Bonfim, Portugal, 2014

Hospitals Senhor do BonfimThe private health care institution „Hospitals Senhor do Bonfirm“ (HSB) is equipped with modern and innovative facilities at national and European level that were built with excellent materials. Many of them are used for the first time in Portugal. The systems for building automation were installed and implemented by the LOYTEC system integrator RACE.

Hotel Royal Óbidos, Portugal, 2014

Hotel Evolutee PortugalThe five-star Evolutee Hotel is located in the western region of Portugal. Only materials and techniques that meet environmental standards were used for the construction of the building, along with the efficient technology of LOYTEC that was implemented by the LOYTEC systems integrator RACE.

RMZ Galleria, Bangalore, India, 2014

RMZ GalleriaThe retail, office, and hotel block "Galleria" in India receives a comprehensive BMS solution from the LOYTEC systems integrator Venba Tech, including monitoring an controlling of air handlers, ventilation and plumbing system, and lighting. 

AKDR Tower, Chennai, India, 2013

AKDR TowerThe Indian LOYTEC systems integrator Venba Tech implemented the building management software for the AKDR Tower, an IT building in Chennai that mainly houses information technology companies. 

Raiffeisenbank, Lieboch-Stainz, Austria, 2013

Raiffeisenbank Lieboch-StainzA sustainable and comprehensive renovation of a bank branch, considering ecological, economical, and social aspects, carried out by the LOYTEC systems integrator EAM Systems GmbH.