Designed by the architect Meinhard von Gerkan, the station was built on the former ground of the Lehrter Bahnhof and put in operation on May, 28th, 2006 as Berlin Central Station.
The railway building has two main levels serving the rail traffic as well as three connecting and business levels with 15,000 m² shop surfaces for approximately 80 retail businesses. Altogether, 900 people work in the actual station including 150 employees of the ‘Deutsche Bahn AG’. Additionally, 42,000 m² of office surface is available.
Interesting Facts
Devices: L-Switch, L-IP Router, L-Term
Location | Berlin, Germany |
Number of Nodes |
NA |
Topology | CEA-709 with IP-852 (Ethernet/IP) backbone |
Companies involved |
Sauter-Cumulus GmbH |
LOYTEC Components |
38 L-IP Router 4 L-Switch LS-13300C 32 L-Switch LS-13333C 75 L-Switch LS-13CB 53 L-Switch LS-33CB 28 L-Term LT-13 122 L-Term LT-33 |
LOYTEC Tools |
NA |