Case studies

Central Station Berlin, Germany

berlin_hbf_s.jpg Designed by the architect Meinhard von Gerkan, the station was built on the former ground of the Lehrter Bahnhof and put in operation on May 28th, 2006 as Berlin Central Station.

Il sole 24 ore - Head Office, Milan, Italy

ilsole24ore_s.jpg With the head office of Italy’s leading financial journal ‘Il sole 24 ore’, a building complex with more than 1,200 office and conference rooms and a surface area of 48,000 m² arose.

Landesbank Baden-Württemberg (LBBW), Stuttgart, Germany, 2009

lbbw_s.jpg The building of the‘Landesbank Baden-Württemberg LBBW’with a surface area of 58,000 m² is located 300 meters away from the central station of Stuttgart, Germany. The most important goal was to create a comfortable room climate for the employees and at the same time keep the operating costs low.

Largest-ever cruise ship 'Oasis of the Seas', 2009

oots_150.jpg For the largest-ever cruise ship 'Oasis of the Seas', LOYTEC’s L-IP Redundant CEA-709/IP router was chosen to set up an IP-852 (Ethernet/IP) channel as a backbone for high speed communication.