Case studies

Office Building "People Hub" in Rome, Italy, 2021

Imagery ©2022 Google, Imagery ©2022 Maxar Technologies, Map data ©2022 The new Accenture hub in Italy was inaugurated in Rome in 2019, and it consists of six towers connected to each other at each level along 26000 square meters of surface.

Residenza Hollmann, Hotel in Trieste, Italy, 2020

Hollmann googleRead about the Residenza Hollmann project in Italy and how LOYTEC room energy management accommodates guest comfort and energy efficiency.

Office Park 4, Office Building in Schwechat, Austria, 2020

office park schwechatClose to Vienna International Airport (VIE) the Office Park 4 building complex offers more than 20,000 m² of office space and flexible co-working areas. Thanks to LOYTEC L-ROC Room Automation, tenants benefit from high user comfort and energy savings generated by automatic shading, DALI constant light control including optimal temperature control. Discover more details about this impressive project!

Tire Factory in Aksaray, Turkey, 2020

tire turkeyOne of the most important Bridgestone factories is rated to produce arround 4.2 million tires a year. Find out how LOYTEC hardware used in the test lab to control the HVAC system helped the customer to reach a "zero defect" products target.