Office Park 4, Office Building in Schwechat, Austria, 2020

office park schwechatSolution: L-ROC Room Automation

Close to Vienna International Airport (VIE) the Office Park 4 building complex offers more than 20000 m² of office space, flexible co-working areas and dedicated event areas with a capacity of up to 400 guests. The operator paid particular attention to the energy efficiency of the building, with a geothermal system in connection with a heat pump system making a valuable contribution to energy supply. This energy is used to operate the suspended heating and cooling ceilings on the office and conference floors. The energy is collected and fed to a heat pump system in the basement of the building.

L-ROC Room Automaton enables energy efficiency

The project requirement for autonomous room controls with the features of automatic shading using SMI technology and DALI constant light control including optimal temperature control was made in cooperation between Johnson Controls and LOYTEC electronics GmbH using their latest L-ROC room controllers and their associated room control units of the L-STAT generation. Over 4600 DALI lights, 730 DALI multi-sensors, 1700 SMI blind drives, 750 dew point sensors, 1000 window contacts, 800 small valves for heating / cooling ceiling control, 200 differential pressure-independent control ball valves were processed using Modbus in the change over system. The relevant data points are connected via standard BACnet / IP.

Integrated into the VIE Control System

The integration into the airport building control system with its 120000 data points rounded off this successful and impressive project.

„Despite all the difficulties, such as the shortest possible construction phase, enormous technical challenges and the massive pressure on the part of the general contractor, we mastered this impressive undertaking with flying colors, in all respects.“ Walter Neuberg

Conclusion

The Office Park 4 is indeed an impressive project that excites investors and tenants. With a third less energy consumption than conventional office buildings, Office Park 4 has already received the DGNB Platinum Certificate and the Crystal Award for sustainability, and these will certainly not be the last ones getting impressed by the benefits of L-ROC room automation.

office park schwechat office park 4 photo flughafen wien homepage 2 office park 4 photo flughafen wien homepage 3 office park 4 photo flughafen wien homepage 4


Interesting Facts

Devices: L-ROC Room Automation, L-DALI Lighting Control, L-STAT Room Control Units, L-IOB I/O Modules

Location Schwechat, Austria
Number of nodes 120 000 Datapoints
Topology IP
Companies involved Johnson Controls Austria GmbH & Co OG
LOYTEC products 137 x LROC-400 Room Controller
728 x LDALI-MS2 Multi-Sensor
529 x LSTAT-800 Room Control Unit
120 x LSMI-804 Interface
137 x LIOB-551 I/O Module
LOYTEC tools LWEB-900 Integrated Building Management Software
L-STUDIO