Case studies
BEMAX Arena in Podgorica, Montenegro, 2020
The multifunctional sports and event hall built in the Seventies now has been revitalized and transformed into a vibrant, integrated facility for the entire community to use. Find out how the retrofit project benefits from LOYTEC products - optimizing energy efficiency, hardware costs and integration time.
Erciyes University in Kayseri, Turkey, 2020
Logistic Center in Piacenza, Italy, 2019
The logistic center located in Piacenza supplies the region Southern Europe for a major European retailer. With sustainability in mind, the furniture store company went for a retrofit of their lighting solution. Take a look at the energy savings potential of modern lighting control systems by LOYTEC!
Delta Electronics Beijing Office, China, 2017
The U.S. Green Building Council (USGBC) has just granted the LEED NC (New Construction) Silver Certification to Delta Electronics’ Beijing Office. Delta’s Beijing office has demonstrated an impressive 20% cut in overall energy costs as compared to the annual baseline reference of the 2007 ASHREA standard 90.1.
Langestraße 100, Baden-Baden, Germany, 2016
Continente Hypermarket, Braga Nova Arcada, Portugal, 2016
The LOYTEC Competence Partner RACE installed a total control solution for the Continente Hypermarket, Braga Nova Arcada based on LOYTEC components. The solution integrates all systems of the store from refrigeration to HVAC and lighting and allows for increased energy efficiency and transparent management of the technical equipment.
Royal Australian Air Force, Pearce Base, Perth, Australia, 2016
The Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.
Parmelia Hotel (Hilton), Perth, Australia, 2016
NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015
University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015
PAMA fahd al ahmad branch, Kuwait, 2015
The LOYTEC Competence Partner Ahmed Isaq Co. integrated electrical and mechanical systems in the PAMA fahd al ahmad branch in Kuwait, the seat of the public authority of minority affairs.
PAMA west al jahra branch, Kuwait, 2015
Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.
District Office Sigmaringen, Germany, 2015
At the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.
Business Park Vienna, Austria, 2015
The great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.
Hotel Management School Belvoirpark, Switzerland, 2015
PentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.
Fire Directorate, Kuwait, 2015
The Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.
AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015
The AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.
Penal Institution Schwerte, Germany, 2015
The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.
Rheinwerk 3, Bonn, Germany, 2015
Rheinwerk 3 is a premium office facility located in the former German capital Bonn. Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs.
Continente Hypermarket, Matosinhos, Portugal, 2015
The LOYTEC Competence Partner RACE implemented a new building management system using the latest technology of LOYTEC in the Continente Hypermarket in Matosinhos, Portugal.
Osceola County Health Department, Poinciana, Florida, 2014
Osceola County Health Department is a five million dollar medical facility in Florida. For the control of the HVAC system of the building, the LOYTEC Competence Partner Total Building Integrations Inc. installed an ALL-IP BACnet system with LOYTEC components.
Hypermarket in Alor Setar - Kedah, Malaysia 2014
The LOYTEC partner M&C Engineering and Trading Sdn Bhd implemented a project for a new hypermarket in Alor Setar - Kedah, Malaysia. There, LOYTEC’s powerful LINX-110 Automation Servers extended with L-IOB I/O Modules are in charge of controlling and monitoring the hypermarkets’ systems.
Quartier 17, Hanseatic City Stralsund, Germany, 2014
A project of the LOYTEC Competence Partner Dr. Diestel regarding control and visualization of different room air conditioning systems of the newly built Quartier 17 in the Hanseatic City Stralsund in Germany.
Heatherbrae Elementary School, Arizona, USA, 2014
The LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.
Camões Building, Porto, Portugal, 2014
The Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.
Shopping Center Allegro, Setúbal, Portugal, 2014
The shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.
Hospitals Senhor do Bonfim, Portugal, 2014
The private health care institution „Hospitals Senhor do Bonfirm“ (HSB) is equipped with modern and innovative facilities at national and European level that were built with excellent materials. Many of them are used for the first time in Portugal. The systems for building automation were installed and implemented by the LOYTEC system integrator RACE.
Hotel Royal Óbidos, Portugal, 2014
The five-star Evolutee Hotel is located in the western region of Portugal. Only materials and techniques that meet environmental standards were used for the construction of the building, along with the efficient technology of LOYTEC that was implemented by the LOYTEC systems integrator RACE.
RMZ Galleria, Bangalore, India, 2014
The retail, office, and hotel block "Galleria" in India receives a comprehensive BMS solution from the LOYTEC systems integrator Venba Tech, including monitoring an controlling of air handlers, ventilation and plumbing system, and lighting.
AKDR Tower, Chennai, India, 2013
The Indian LOYTEC systems integrator Venba Tech implemented the building management software for the AKDR Tower, an IT building in Chennai that mainly houses information technology companies.
Raiffeisenbank, Lieboch-Stainz, Austria, 2013
A sustainable and comprehensive renovation of a bank branch, considering ecological, economical, and social aspects, carried out by the LOYTEC systems integrator EAM Systems GmbH.
Passeio das Águas Shopping, Brazil, 2013
In the "Passeio des Aguas Shopping", a newly built shopping center in Goiânia, Brazil, the LOYTEC systems integrator RACE installed HVAC, lighting, and energy metering systems, controlled and monitored by LOYTEC components.>
Parc Hotel Alvisse, Dommeldange, Luxembourg, 2013
The PARC HOTEL ALVISSE**** was equipped with the latest technology in the course of a total renovation. L-INX Automation Servers, L-VIS Touch Panels and L-IP Routers of LOYTEC were installed that are now responsible, among other things, for visualization and integration of the indivudual room controllers of the hotel rooms.