Case studies
Fire Directorate, Kuwait, 2015
The Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.
AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015
The AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.
Penal Institution Schwerte, Germany, 2015
The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.
Rheinwerk 3, Bonn, Germany, 2015
Rheinwerk 3 is a premium office facility located in the former German capital Bonn. Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs.
Continente Hypermarket, Matosinhos, Portugal, 2015
The LOYTEC Competence Partner RACE implemented a new building management system using the latest technology of LOYTEC in the Continente Hypermarket in Matosinhos, Portugal.
Osceola County Health Department, Poinciana, Florida, 2014
Osceola County Health Department is a five million dollar medical facility in Florida. For the control of the HVAC system of the building, the LOYTEC Competence Partner Total Building Integrations Inc. installed an ALL-IP BACnet system with LOYTEC components.
Hypermarket in Alor Setar - Kedah, Malaysia 2014
The LOYTEC partner M&C Engineering and Trading Sdn Bhd implemented a project for a new hypermarket in Alor Setar - Kedah, Malaysia. There, LOYTEC’s powerful LINX-110 Automation Servers extended with L-IOB I/O Modules are in charge of controlling and monitoring the hypermarkets’ systems.
Quartier 17, Hanseatic City Stralsund, Germany, 2014
A project of the LOYTEC Competence Partner Dr. Diestel regarding control and visualization of different room air conditioning systems of the newly built Quartier 17 in the Hanseatic City Stralsund in Germany.
Heatherbrae Elementary School, Arizona, USA, 2014
The LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.
Camões Building, Porto, Portugal, 2014
The Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.
Shopping Center Allegro, Setúbal, Portugal, 2014
The shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.
Hospitals Senhor do Bonfim, Portugal, 2014
The private health care institution „Hospitals Senhor do Bonfirm“ (HSB) is equipped with modern and innovative facilities at national and European level that were built with excellent materials. Many of them are used for the first time in Portugal. The systems for building automation were installed and implemented by the LOYTEC system integrator RACE.
Hotel Royal Óbidos, Portugal, 2014
The five-star Evolutee Hotel is located in the western region of Portugal. Only materials and techniques that meet environmental standards were used for the construction of the building, along with the efficient technology of LOYTEC that was implemented by the LOYTEC systems integrator RACE.
RMZ Galleria, Bangalore, India, 2014
The retail, office, and hotel block "Galleria" in India receives a comprehensive BMS solution from the LOYTEC systems integrator Venba Tech, including monitoring an controlling of air handlers, ventilation and plumbing system, and lighting.
AKDR Tower, Chennai, India, 2013
The Indian LOYTEC systems integrator Venba Tech implemented the building management software for the AKDR Tower, an IT building in Chennai that mainly houses information technology companies.
Raiffeisenbank, Lieboch-Stainz, Austria, 2013
A sustainable and comprehensive renovation of a bank branch, considering ecological, economical, and social aspects, carried out by the LOYTEC systems integrator EAM Systems GmbH.
Passeio das Águas Shopping, Brazil, 2013
In the "Passeio des Aguas Shopping", a newly built shopping center in Goiânia, Brazil, the LOYTEC systems integrator RACE installed HVAC, lighting, and energy metering systems, controlled and monitored by LOYTEC components.>
Parc Hotel Alvisse, Dommeldange, Luxembourg, 2013
The PARC HOTEL ALVISSE**** was equipped with the latest technology in the course of a total renovation. L-INX Automation Servers, L-VIS Touch Panels and L-IP Routers of LOYTEC were installed that are now responsible, among other things, for visualization and integration of the indivudual room controllers of the hotel rooms.
Maintenance facility Herdern, Zurich, Switzerland, 2014
Swiss Federal Railways (SBB AG) extended the maintenance facility Herdern at the Herdern-Areal in Zurich-Altstetten to one of the most modern maintenance facilities for service and repair work. PentaControl AG was entrusted by the general contractor Allreal AG with the complete building automation, whereby it applied latest technologies.
"The Warehouse", Copenhagen, Denmark, 2013
“The Warehouse” in Copenhagen is a new office building for different tenants. The new building needed an appropriate automation system for automating the functions of ventilation, heating/cooling, and lighting.
COWI Headquarters, Copenhagen, Denmark, 2013
COWI is one of the largest consultant engineering companies in Denmark. Its headquarters is situated in Kongens Lyngby just outside the center of Copenhagen. In course of a total renovation of the building it was necessary to implement a Building Management System for ventilation, heating, and lighting.
California Plaza Parking Garage, California, USA, 2012
City of Chandler, Municipal Buildings, Arizona, USA, 2012
The City of Chandler, Arizona, marks 100 years of age in May 2012. Chandler describes itself as “an All-America City where entrepreneurial spirit and hometown traditions intermingle to make Chandler a truly fun place to be. Chandler has exceptional services, a diverse culture and a vibrant history.”
St. Louis Zoo, Missouri, USA, 2012
Holzhafen Hamburg West, Hamburg, Germany, 2011
Located between the traditional Hamburg fish market and the ferry terminals, “Holzhafen Hamburg” is one of the top addresses on the river Elbe. This is the location of the office building “Holzhafen West”, whose style is inspired by typical Hamburg storage buildings.
Rigshospitalet Copenhagen, Denmark, 2011
Rheinhallen (RTL Studios), Cologne, Germany, 2011
It’s a building of superlatives: the biggest building site in Germany while under construction, one of the largest office complexes all over Europe and the biggest one in Germany, measured by its gross floor area of 160,000 square meters. And Europe’s biggest private TV station has moved in, the RTL media group....
School District of Decatur Township, Indianapolis, USA, 2011
The Decatur Intermediate Learning Center and local district Sports Center, located in the Decatur Township, Indiana USA, faced a situation common to many modern schools with a building having multiple use requirements throughout the week for regular and extracurricular activities. To maximize energy savings on equipment usage the ability to schedule occupancy properly has become a must.
ThyssenKrupp Quarter, Essen, Germany, 2011
It was Europe’s biggest house moving when ThyssenKrupp relocated its headquarters to Essen (Germany) last summer. Dominant centre of the new headoffice is the Q1 building, forming an impressive landmark in its distinctive shape of a cube. All the buildings on the campus are based on an overriding design framework, the shell-core principle.
R+V Insurance, Wiesbaden, Germany, 2010
R+V insurance is one of the largest insurance groups in Germany. 2010, at the companies site in Wiesbaden (Germany) the room automation of the representation floor and the company canteen as well as the control technology for central ventilation and refrigerating systems were renewed.
RWE Supply & Trading, Essen, Germany, 2010
Being a subsidiary of RWE AG, RWE Supply & Trading GmbH is one of the leading companies in European energy trading. RWE Supply & Trading takes the responsibility of a gas procurement volume of nearly 50 billion cubic metres per year and is responsible for all of RWE’s activities on the international procurement and wholesale markets for energy.
Parkway Atrium Building, Herndon, Virginia, USA, 2010
The Parkway Atrium Building is a 23 year old four story 184,000 sqft Class B office building located in the suburbs of Washington DC. The building was constructed as a spec building and has been through numerous small changes and a major renovation in 2004. In 2006 a new management of the building began to identify and implement energy conservation methods.
Dallas Cowboys Football Stadium, Arlington/Texas, USA, 2009
It is the most spectacular stadium in the world, an architecturally-significant and technologically advanced sports venue. The 3 million-square-foot stadium has an approximate capacity of up to 100,000 fans. As the largest NFL venue ever built, the new stadium boasts the most spectacular column-free room in the world, stretching a quarter-mile in length.
Landesbank Baden-Württemberg (LBBW), Stuttgart, Germany, 2009
The building of the ‘Landesbank Baden-Württemberg LBBW’ with a surface area of 58,000 m² is located 300 meters away from the central station of Stuttgart, Germany. The most important goal was to create a comfortable room climate for the employees and at the same time keep the operating costs low.
Largest-ever cruise ship 'Oasis of the Seas', 2009
For the largest-ever cruise ship 'Oasis of the Seas', LOYTEC’s L-IP Redundant CEA-709/IP router was chosen to set up an IP-852 (Ethernet/IP) channel as a backbone for high speed communication.
Ernst & Young Headquarters Sydney, Australia
New high-rise Ernst & Young Center in Sydney, Australia comprises the main tower of 44 levels offering minimum A grade quality accommodation. The building benefits from a central core with full height double glazed windows, allowing excellent natural light and views from the upper levels to all elevations.
Il sole 24 ore - Head Office, Milan, Italy
With the head office of Italy’s leading financial journal ‘Il sole 24 ore’, a building complex with more than 1,200 office and conference rooms and a surface area of 48,000 m² arose.
Landesmesse Stuttgart, Germany
The 'Landesmesse Stuttgart' is a state-of-the-art showground with architectural and functional convincing buildings. A widely ramified CEA-709 network takes care of lighting and shading.
China Reinsurance Office Building, Beijing, China
The China Reinsurance office building is near the famous Financial Street in Beijing, China. The building automation system is designed to use LOYTEC components.
Central Station Berlin, Germany
Designed by the architect Meinhard von Gerkan, the station was built on the former ground of the Lehrter Bahnhof and put in operation on May 28th, 2006 as Berlin Central Station.