Case studies

PAMA west al jahra branch, Kuwait, 2015

PAMA west al jahra branch, Kuwait, 2015Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.

District Office Sigmaringen, Germany, 2015

District Office SigmaringenAt the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.

Business Park Vienna, Austria, 2015

MR-TechThe great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.

Poinciana High School, USA, 2015

Poinciana High SchoolThe LOYTEC Competence Partner TBI was awarded the project of replacing the building automation system in the oldest area of Poinciana High School. The project consisted of 37 AHUs (Air Handling Units), 2 chiller plants and 164 VAV (Variable Air Volume) units.

Hotel Management School Belvoirpark, Switzerland, 2015

Hotel Management School BelvoirparkPentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.

Secondary School Loulé, Algarve, Portugal, 2015

Secondary School Loulé, Algarve, Portugal, 2015In the course of Portugal's Secondary School’s Modernization Program, the secondary school Loulé in the Algarve region has been modernized by RACE using LOYTEC products.

Fire Directorate, Kuwait, 2015

Fire Directorate, KuwaitThe Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components. 

AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015

AIM Recycling CenterThe AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.

Penal Institution Schwerte, Germany, 2015

JVA Schwerte The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte. 

Rheinwerk 3, Bonn, Germany, 2015

Rheinwerk3, GermanyRheinwerk 3 is a premium office facility located in the former German capital Bonn. Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs.

Continente Hypermarket, Matosinhos, Portugal, 2015

Hypermarket Continente, MatosinhosThe LOYTEC Competence Partner RACE implemented a new building management system using the latest technology of LOYTEC in the Continente Hypermarket in Matosinhos, Portugal.

Osceola County Health Department, Poinciana, Florida, 2014

Osceola County Health DepartmentOsceola County Health Department is a five million dollar medical facility in Florida. For the control of the HVAC system of the building, the LOYTEC Competence Partner Total Building Integrations Inc. installed an ALL-IP BACnet system with LOYTEC components. 

Hypermarket in Alor Setar - Kedah, Malaysia 2014

Hypermarket in Alor Setar - Kedah, MalaysiaThe LOYTEC partner M&C Engineering and Trading Sdn Bhd implemented a project for a new hypermarket in Alor Setar - Kedah, Malaysia. There, LOYTEC’s powerful LINX-110 Automation Servers extended with L-IOB I/O Modules are in charge of controlling and monitoring the hypermarkets’ systems. 

Quartier 17, Hanseatic City Stralsund, Germany, 2014

Quartier 17A project of the LOYTEC Competence Partner Dr. Diestel regarding control and visualization of different room air conditioning systems of the newly built Quartier 17 in the Hanseatic City Stralsund in Germany.

Heatherbrae Elementary School, Arizona, USA, 2014

DVHRThe LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.

Camões Building, Porto, Portugal, 2014

Camões BuildingThe Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.

Shopping Center Allegro, Setúbal, Portugal, 2014

Allegro SetúbalThe shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.

Hospitals Senhor do Bonfim, Portugal, 2014

Hospitals Senhor do BonfimThe private health care institution „Hospitals Senhor do Bonfirm“ (HSB) is equipped with modern and innovative facilities at national and European level that were built with excellent materials. Many of them are used for the first time in Portugal. The systems for building automation were installed and implemented by the LOYTEC system integrator RACE.

Hotel Royal Óbidos, Portugal, 2014

Hotel Evolutee PortugalThe five-star Evolutee Hotel is located in the western region of Portugal. Only materials and techniques that meet environmental standards were used for the construction of the building, along with the efficient technology of LOYTEC that was implemented by the LOYTEC systems integrator RACE.

RMZ Galleria, Bangalore, India, 2014

RMZ GalleriaThe retail, office, and hotel block "Galleria" in India receives a comprehensive BMS solution from the LOYTEC systems integrator Venba Tech, including monitoring an controlling of air handlers, ventilation and plumbing system, and lighting. 

AKDR Tower, Chennai, India, 2013

AKDR TowerThe Indian LOYTEC systems integrator Venba Tech implemented the building management software for the AKDR Tower, an IT building in Chennai that mainly houses information technology companies.

Raiffeisenbank, Lieboch-Stainz, Austria, 2013

Raiffeisenbank Lieboch-StainzA sustainable and comprehensive renovation of a bank branch, considering ecological, economical, and social aspects, carried out by the LOYTEC systems integrator EAM Systems GmbH.

Passeio das Águas Shopping, Brazil, 2013

Passeio das Aguas ShoppingIn the "Passeio des Aguas Shopping", a newly built shopping center in Goiânia, Brazil, the LOYTEC systems integrator RACE installed HVAC, lighting, and energy metering systems, controlled and monitored by LOYTEC components.>

Parc Hotel Alvisse, Dommeldange, Luxembourg, 2013

Parc Hotel Alvisse, LuxemburgThe PARC HOTEL ALVISSE**** was equipped with the latest technology in the course of a total renovation. L-INX Automation Servers, L-VIS Touch Panels and L-IP Routers of LOYTEC were installed that are now responsible, among other things, for visualization and integration of the indivudual room controllers of the hotel rooms.

LOYTEC Headquarters, Vienna, Austria, 2014

LOYTEC_Headquarters_BG37The revolutionary room automation system L-ROC proves its capabilities in the new LOYTEC headquarters, where it automates heating/cooling, sunblinds, and lighting.

Maintenance facility Herdern, Zurich, Switzerland, 2014

Serviceanlage HerdernSwiss Federal Railways (SBB AG) extended the maintenance facility Herdern at the Herdern-Areal in Zurich-Altstetten to one of the most modern maintenance facilities for service and repair work. PentaControl AG was entrusted by the general contractor Allreal AG with the complete building automation, whereby it applied latest technologies.

"The Warehouse", Copenhagen, Denmark, 2013

The Warehouse“The Warehouse” in Copenhagen is a new office building for different tenants. The new building needed an appropriate automation system for automating the functions of ventilation, heating/cooling, and lighting.

COWI Headquarters, Copenhagen, Denmark, 2013

COWI Headquarters

COWI is one of the largest consultant engineering companies in Denmark. Its headquarters is situated in Kongens Lyngby just outside the center of Copenhagen. In course of a total renovation of the building it was necessary to implement a Building Management System for ventilation, heating, and lighting.

Institute for Physical Chemistry, Kiel, Germany, 2013

Institute for Physical ChemistryThe Institute for Physical Chemistry of Christian-Albrechts University (CAU) at Kiel, Germany, was reconstructed. In particular, the installation of the ventilation system and the associated building auto­mation system was commissioned. 

Rexholm Logistics Center, Holstebro, Denmark, 2012

RexholmIn September 2012 the construction of the new REXHOLM distribution center and warehouse was completed. The new 15,000 square meters facility is the central point for REXHOLM’s textile business in Scandinavia.

California Plaza Parking Garage, California, USA, 2012

CalPlazaGarageCalifornia Plaza, Walnut Creek, CA had the task of upgrading the 200,000 square foot, three level covered parking garage for their ten story Class A office. The existing system ran on a preset time schedule and did not provide condition status of the exhaust fans.

City of Chandler, Municipal Buildings, Arizona, USA, 2012

city of chandler_fire-deptThe City of Chandler, Arizona, marks 100 years of age in May 2012. Chandler describes itself as “an All-America City where entrepreneurial spirit and hometown traditions intermingle to make Chandler a truly fun place to be. Chandler has exceptional services, a diverse culture and a vibrant history.”

Olympus Oil Rig, Gulf of Mexico, USA, 2012

Oil_Rig Offshore oil rigs have stringent design considerations for mechanical and control systems. Special materials and durability is a must to last in the conditions of salt air. This requires that the mechanicals have special skills.

St. Louis Zoo, Missouri, USA, 2012

ZooStLouis_Sealion Sea Lion Sound is a new exhibit for the Zoo of St. Louis, opening in June 2012. According to the zoo's website: “For the first time anywhere in North America, visitors will walk through an underwater tunnel into the sea lions' habitat to see the animals swimming all around them!....

Sony Corporation Sony City Osaki, Tokyo, Japan, 2012

sonycityosaki_tokyo The R&D facility of Sony Corporation at Sony City Osaki is equipped with a wide range of energy-saving features that ensure an outstanding environmental performance. These include....

Kuhlenwall Karree, Duisburg, Germany, 2012

kuhlenwall The administration building of Sparkasse Duisburg, situated at a first class location in Duisburg’s downtown, became revitalized entirely. In constructional and ecological terms the building was brought to an as-good-as-new-level.

Bouygues Headquarters, Ashgabat, Turkmenistan, 2011

01 Bouygues’ new headquarters building is the first Green Building all over Turkmenistan. Based in the capital Ashgabat, Bouygues Turkmen (BTK) is a subsidiary of Bouygues Construction, a French construction company.

Holzhafen Hamburg West, Hamburg, Germany, 2011

kristallvonelbeseite01

Located between the traditional Hamburg fish market and the ferry terminals, “Holzhafen Hamburg” is one of the top addresses on the river Elbe. This is the location of the office building “Holzhafen West”, whose style is inspired by typical Hamburg storage buildings.

Rigshospitalet Copenhagen, Denmark, 2011

rigshos-bygning.jpg With more than 1.100 beds, Rigshospitalet is the largest hospital in Denmark and has responsibility for 65.000 yearly inpatients and approximately 420.000 ambulant visits annually.It is by far the most specialized hospital in Denmark with more than 8.000 employees.

Kröller-Müller Museum, Otterlo, Netherlands, 2011

museum One of the most attractive museums in the Netherlands is the Kröller-Müller Museum near Otterlo. Situated in the center of the De Hoge Veluwe National Park, it exhibits the world’s second largest collection of Van Gogh paintings.

Rheinhallen (RTL Studios), Cologne, Germany, 2011

koeln3.jpgIt’s a building of superlatives: the biggest building site in Germany while under construction, one of the largest office complexes all over Europe and the biggest one in Germany, measured by its gross floor area of 160,000 square meters. And Europe’s biggest private TV station has moved in, the RTL media group....

School District of Decatur Township, Indianapolis, USA, 2011

decatur-intermediate-learning-cente_04.jpgThe Decatur Intermediate Learning Center and local district Sports Center, located in the Decatur Township, Indiana USA, faced a situation common to many modern schools with a building having multiple use requirements throughout the week for regular and extracurricular activities. To maximize energy savings on equipment usage the ability to schedule occupancy properly has become a must.

ThyssenKrupp Quarter, Essen, Germany, 2011

thyssen It was Europe’s biggest house moving when ThyssenKrupp relocated its headquarters to Essen (Germany) last summer. Dominant centre of the new headoffice is the Q1 building, forming an impressive landmark in its distinctive shape of a cube. All the buildings on the campus are based on an overriding design framework, the shell-core principle.

R+V Insurance, Wiesbaden, Germany, 2010

rv_insurance_150x100.jpgR+V insurance is one of the largest insurance groups in Germany. 2010, at the companies site in Wiesbaden (Germany) the room automation of the representation floor and the company canteen as well as the control technology for central ventilation and refrigerating systems were renewed.

RWE Supply & Trading, Essen, Germany, 2010

rwe_front_head_office_150x89.jpgBeing a subsidiary of RWE AG, RWE Supply & Trading GmbH is one of the leading companies in European energy trading. RWE Supply & Trading takes the responsibility of a gas procurement volume of nearly 50 billion cubic metres per year and is responsible for all of RWE’s activities on the international procurement and wholesale markets for energy.

Parkway Atrium Building, Herndon, Virginia, USA, 2010

381eldenstreete_150x140.jpg

The Parkway Atrium Building is a 23 year old four story 184,000 sqft Class B office building located in the suburbs of Washington DC. The building was constructed as a spec building and has been through numerous small changes and a major renovation in 2004. In 2006 a new management of the building began to identify and implement energy conservation methods.

Dallas Cowboys Football Stadium, Arlington/Texas, USA, 2009

dallas cowboys stadium 937x434It is the most spectacular stadium in the world, an architecturally-significant and technologically advanced sports venue. The 3 million-square-foot stadium has an approximate capacity of up to 100,000 fans. As the largest NFL venue ever built, the new stadium boasts the most spectacular column-free room in the world, stretching a quarter-mile in length.

Landesbank Baden-Württemberg (LBBW), Stuttgart, Germany, 2009

lbbw_s.jpg The building of the ‘Landesbank Baden-Württemberg LBBW’ with a surface area of 58,000 m² is located 300 meters away from the central station of Stuttgart, Germany. The most important goal was to create a comfortable room climate for the employees and at the same time keep the operating costs low.

Largest-ever cruise ship 'Oasis of the Seas', 2009

oots_150.jpg For the largest-ever cruise ship 'Oasis of the Seas', LOYTEC’s L-IP Redundant CEA-709/IP router was chosen to set up an IP-852 (Ethernet/IP) channel as a backbone for high speed communication.

Ernst & Young Headquarters Sydney, Australia

ernst_young_s.jpg New high-rise Ernst & Young Center in Sydney, Australia comprises the main tower of 44 levels offering minimum A grade quality accommodation. The building benefits from a central core with full height double glazed windows, allowing excellent natural light and views from the upper levels to all elevations.