Case studies

Heatherbrae Elementary School, Arizona, USA, 2014

DVHRThe LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.

Camões Building, Porto, Portugal, 2014

Camões BuildingThe Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.

Shopping Center Allegro, Setúbal, Portugal, 2014

Allegro SetúbalThe shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.

Hospitals Senhor do Bonfim, Portugal, 2014

Hospitals Senhor do BonfimThe private health care institution „Hospitals Senhor do Bonfirm“ (HSB) is equipped with modern and innovative facilities at national and European level that were built with excellent materials. Many of them are used for the first time in Portugal. The systems for building automation were installed and implemented by the LOYTEC system integrator RACE.

Hotel Royal Óbidos, Portugal, 2014

Hotel Evolutee PortugalThe five-star Evolutee Hotel is located in the western region of Portugal. Only materials and techniques that meet environmental standards were used for the construction of the building, along with the efficient technology of LOYTEC that was implemented by the LOYTEC systems integrator RACE.