Etudes de cas

Raiffeisenbank, Lieboch-Stainz, Austria, 2013

Raiffeisenbank Lieboch-Stainz

A sustainable and comprehensive renovation of a bank branch, considering ecological, economical, and social aspects, carried out by the LOYTEC systems integrator EAM Systems GmbH.

LOYTEC Headquarters, Vienna, Austria, 2014

LOYTEC_Headquarters_BG37The revolutionary room automation system L-ROC proves its capabilities in the new LOYTEC headquarters, where it automates heating/cooling, sunblinds, and lighting.

Passeio das Águas Shopping, Brazil, 2013

Passeio das Aguas ShoppingIn the "Passeio des Aguas Shopping", a newly built shopping center in Goiânia, Brazil, the LOYTEC systems integrator RACE installed HVAC, lighting, and energy metering systems, controlled and monitored by LOYTEC components.>

Parc Hotel Alvisse, Dommeldange, Luxembourg, 2013

Parc Hotel Alvisse, LuxemburgThe PARC HOTEL ALVISSE**** was equipped with the latest technology in the course of a total renovation. L-INX Automation Servers, L-VIS Touch Panels and L-IP Routers of LOYTEC were installed that are now responsible, among other things, for visualization and integration of the indivudual room controllers of the hotel rooms.