Etudes de cas

Poinciana High School, USA, 2015

Poinciana High SchoolThe LOYTEC Competence Partner TBI was awarded the project of replacing the building automation system in the oldest area of Poinciana High School. The project consisted of 37 AHUs (Air Handling Units), 2 chiller plants and 164 VAV (Variable Air Volume) units.

Secondary School Loulé, Algarve, Portugal, 2015

Secondary School Loulé, Algarve, Portugal, 2015In the course of Portugal's Secondary School’s Modernization Program, the secondary school Loulé in the Algarve region has been modernized by RACE using LOYTEC products.

Fire Directorate, Kuwait, 2015

Fire Directorate, KuwaitThe Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components. 

Penal Institution Schwerte, Germany, 2015

JVA Schwerte The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.