Etudes de cas

Austria Campus, Vienne, 2018

Foto: SIGNAIdéalement situé dans le deuxième arrondissement de Vienne, considéré comme un des meilleurs quartiers d’affaire de la ville, AUSTRIA CAMPUS sort de terre.

Delta Electronics Beijing Office, China, 2017

Delta Electronics Beijing OfficeThe U.S. Green Building Council (USGBC) has just granted the LEED NC (New Construction) Silver Certification to Delta Electronics’ Beijing Office. Delta’s Beijing office has demonstrated an impressive 20% cut in overall energy costs as compared to the annual baseline reference of the 2007 ASHREA standard 90.1. 

Parmelia Hotel (Hilton), Perth, Australia, 2016

Parmelia HotelThe company BCS was commissioned to upgrade the existing Chiller Controls in the Parmelia Hilton. The new system provides the hotel operator with improved monitoring and control features and delivers extensive experience values for energy efficient operations.

Le Supermarché Continente du Nova Arcada à Braga au Portugal, 2016

Continente Hypermarket, Braga Nova ArcadaRACE, Competence Partner de LOYTEC vient d’installer une solution de contrôle complète basée sur les produits LOYTEC dans l'hypermarché Continente, dans le centre commercial appelé Nova Arcada situé à Braga. La solution intègre tous les systèmes du magasin à partir de la réfrigération jusqu’à la CVC et l'éclairage de façon à permettre une efficacité énergétique accrue et une gestion transparente des équipements techniques.

Royal Australian Air Force, Pearce Base, Perth, Australia, 2016

raafThe Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.