case_study_iconLOYTEC components are used in many buildings. Have a look at LOYTEC's references.

Aéroport de Manchester, Manchester, Grande Bretagne, 2013

Terminal 2 - Manchester AirportCalon, intégrateur système LOYTEC, en association avec la société Building Environment Controls a mis en place un système d’éclairage moderne DALI comprenant un contrôle de niveau d’éclairage constant ainsi que la détection de présence, le tout au sein du Terminal 2 de l’aéroport de Manchester.

Parc Hotel Alvisse, Dommeldange, Luxembourg, 2013

Parc Hotel Alvisse, LuxemburgThe PARC HOTEL ALVISSE**** was equipped with the latest technology in the course of a total renovation. L-INX Automation Servers, L-VIS Touch Panels and L-IP Routers of LOYTEC were installed that are now responsible, among other things, for visualization and integration of the indivudual room controllers of the hotel rooms.

COWI Headquarters, Copenhagen, Denmark, 2013

COWI Headquarters

COWI is one of the largest consultant engineering companies in Denmark. Its headquarters is situated in Kongens Lyngby just outside the center of Copenhagen. In course of a total renovation of the building it was necessary to implement a Building Management System for ventilation, heating, and lighting.

"The Warehouse", Copenhagen, Denmark, 2013

The Warehouse“The Warehouse” in Copenhagen is a new office building for different tenants. The new building needed an appropriate automation system for automating the functions of ventilation, heating/cooling, and lighting.

Institute for Physical Chemistry, Kiel, Germany, 2013

Institute for Physical ChemistryThe Institute for Physical Chemistry of Christian-Albrechts University (CAU) at Kiel, Germany, was reconstructed. In particular, the installation of the ventilation system and the associated building auto­mation system was commissioned.